HV RELAY ASSEMBLY INSPECTION

PROCEDURE


  1. INSPECT HYBRID BATTERY JUNCTION BLOCK ASSEMBLY


    1. Inspect SMRB.


      1. A01UXWPE02
        Text in Illustration
        *a

        Component without harness connected

        (Hybrid Battery Junction Block Assembly)

        Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        (+) - (CBI) Battery voltage is not applied between terminals 1 (SMRB) and 2 (GND) 10 kΩ or higher
        Battery voltage is applied between terminals 1 (SMRB) and 2 (GND) Below 1 Ω
      2. Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        1 (SMRB) - 2 (GND) -40 to 80°C (-40 to 176°F) 25.0 to 59.0 Ω

        If the result is not as specified, replace the hybrid battery junction block assembly or electric vehicle fuse.

    2. Inspect SMRG.


      1. A01UYD2E02
        Text in Illustration
        *a

        Component without harness connected

        (Hybrid Battery Junction Block Assembly)

        Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        (CEI) - (-) Battery voltage is not applied between terminals 3 (SMRG) and 2 (GND) 10 kΩ or higher
        Battery voltage is applied between terminals 3 (SMRG) and 2 (GND) Below 1 Ω
      2. Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        3 (SMRG) - 2 (GND) -40 to 80°C (-40 to 176°F) 25.0 to 59.0 Ω

        If the result is not as specified, replace the hybrid battery junction block assembly.

    3. Inspect SMRP.


      1. A01V03BE02
        Text in Illustration
        *a

        Component without harness connected

        (Hybrid Battery Junction Block Assembly)

        Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        (CEI) - (-) Battery voltage is not applied between terminals 4 (SMRP) and 2 (GND) 10 kΩ or higher
        Battery voltage is applied between terminals 4 (SMRP) and 2 (GND) 28.5 to 31.5 Ω
      2. Measure the resistance according to the value(s) in the table below.

        Standard Resistance
        Tester Connection Condition Specified Condition
        4 (SMRP) - 2 (GND) -40 to 80°C (-40 to 176°F) 112 to 274 Ω

        If the result is not as specified, replace the hybrid battery junction block assembly.