PROCEDURE
INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
Install a new gasket onto the intake manifold.
Install the throttle body with motor assembly with the 3 bolts.
Connect the 2 water by-pass hoses and throttle body with motor connector.
INSTALL AIR CLEANER CAP SUB-ASSEMBLY
| *a | Engine Side |
| *b | 75° |
Install the air cleaner hose sub-assembly and lock the hose clamp.
Note
Align the groove of the air cleaner hose with the tab of the throttle body with motor assembly and install the hose.
Make sure that the tab of the air cleaner hose clamp stays within the range shown by *b.
Install the air cleaner cap sub-assembly with the 2 clamps.
Engage the wire harness clamp.
Connect the mass air flow meter connector.
Connect the purge VSV.
Connect the ventilation hose and engage the clamp.
ADD COOLANT (for Engine)
INSPECT FOR COOLANT LEAK (for Engine)
PERFORM INITIALIZATION
Note
Be sure to perform this procedure after reassembling the throttle body with motor assembly, removing and reinstalling any throttle body with motor component or replacing the ECM.
Disconnect the cable from the negative (-) auxiliary battery terminal. Wait at least 60 seconds and reconnect the cable.
Connect the GTS to the DLC3 and clear the DTCs Click here.
Set the vehicle to the inspection mode Click here.
Start the engine without operating the accelerator pedal and check that the MIL is not illuminated and that the idle speed is within the specified range when the air conditioning is switched off after the engine is warmed up.
| Standard | ||||
|---|---|---|---|---|
|
Note
If the accelerator pedal is operated, perform the above steps again.
Be sure to perform this step with all accessories off.
Make sure that park (P) is selected.
Perform a road test and confirm that there are no abnormalities.