POWER BACK DOOR DRIVE UNIT INSTALLATION


  1. INSTALL POWER BACK DOOR UNIT ASSEMBLY


    1. Clean the threaded portion on the vehicle body with a non-residue solvent.

    2. Apply adhesive to the threads of the 7 bolts.

      Adhesive
      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
    3. A01NDSZE01

      Engage the claw as shown in the illustration.

    4. Install the power back door unit with the 5 bolts.

      Torque:
      31 N*m  { 316 kgf*cm, 23 ft.*lbf }
    5. Connect the connector.

    6. A01ND6Z

      Install the 2 bolts.

      Torque:
      31 N*m  { 316 kgf*cm, 23 ft.*lbf }
  2. INSTALL REAR ROOF SIDE RAIL PAD LH


    1. A01NCSA

      Engage the 2 fasteners and install the rear roof rail pad LH.

  3. INSTALL UPPER BACK WINDOW PANEL TRIM


    1. A01NGB3E01
      Text in Illustration
      *1 2-piece Type Clip

      Engage the 7 clips and 6 claws to install the upper back window panel trim.

  4. INSTALL ROOF HEADLINING ASSEMBLY

    Tech Tips

    Refer to the procedure from Install Roof Headlining Assembly Click here.

  5. INITIALIZE POWER BACK DOOR SYSTEM

    Click here