POWER MANAGEMENT CONTROL ECU (for LHD) INSTALLATION


  1. INSTALL POWER MANAGEMENT CONTROL ECU


    1. Install the power management control ECU with the 2 nuts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
  2. INSTALL INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY


    1. A01NCV0

      Engage the claw to connect the connector as shown in the illustration.

    2. A01NHEL

      Engage the 2 claws to lock the connector lock as shown in the illustration.

    3. A01NFRA

      Engage the claw to connect the connector as shown in the illustration.

    4. Install the instrument panel junction block assembly with the 2 nuts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    5. A01NDJRE01

      Connect the 4 connectors (A).

    6. Engage the 2 claws to connect the 2 connectors (B).

    7. Connect the 4 connectors.

  3. INSTALL DRIVER SIDE KNEE AIRBAG ASSEMBLY

    Click here