INSPECT INPUT SHAFT ASSEMBLY END PLAY
Using SST and a dial indicator, measure the input shaft assembly end play.
| Standard End Play |
|---|
| 0.1 to 0.2 mm (0.00394 to 0.00787 in.) |
If the value is not as specified, replace the planetary sun gear snap ring with one of the correct thickness.
INSPECT NO. 1 REAR PLANETARY GEAR ASSEMBLY
Using a feeler gauge, measure the clearance between the No. 1 rear planetary gear assembly and the pinion gear.
| Standard Clearance |
|---|
| 0.2 to 0.8 mm (0.00787 to 0.0315 in.) |
If the value is not as specified, replace the No. 1 rear planetary gear assembly.