INSTALL CHARCOAL CANISTER ASSEMBLY
Install the charcoal canister assembly with the 2 bolts.
Connect the 3 clamps.
| *1 | Retainer |
Install the 2 bolts and clip.
Connect the air inlet line.
Connect the purge line hose.
Push in the vent line tube until the retainer makes a "click" sound.
INSTALL FRONT CENTER FLOOR COVER
| *1 | Bolt |
| *2 | Screw |
Connect the 3 clips and install the front center floor cover.
Install the 7 bolts and 2 screws.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.