INSTALL NO. 1 CIRCUIT BREAKER SENSOR
Install the No. 1 circuit breaker sensor with the 2 bolts to the inverter with converter assembly.
Connect the connector to the No. 1 circuit breaker sensor.
Note
The connectors should be connected securely.
INSTALL VACUUM SWITCHING VALVE
Install the bolt and vacuum switching valve.
Connect the connector and hose.
INSTALL V-BANK COVER SUB-ASSEMBLY
Fit the 4 retainers and install the V-bank cover sub-assembly.
INSTALL INLET NO. 2 AIR CLEANER
Install the inlet No. 2 air cleaner with the 2 bolts.
INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY
Install the intake air resonator sub-assembly with the 2 bolts.
Connect the 3 water hose clamps to the intake air resonator sub-assembly.
INSTALL COOL AIR INTAKE DUCT SEAL
Install the cool air intake duct seal with the 6 clips.
INSTALL ENGINE ROOM SIDE COVER
Install the engine room side cover with the 4 clips.
INSTALL ENGINE ROOM SIDE COVER LH
Install the engine room side cover with the 4 clips.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
PERFORM INITIALIZATION
Some systems need initialization after reconnecting the cable to the negative battery terminal Click here.