КЛАПАН РОГ УСТАНОВКА


  1. INSTALL EGR VALVE ASSEMBLY


    1. A011BD9

      Install a new gasket to the cylinder head.

    2. Insert the EGR valve into the stud bolt, rotate the EGR valve to avoid contact with the delivery pipe, and temporarily install the EGR valve.

    3. A0117RTE01

      Connect the water by-pass hose.

    4. Connect the EGR valve connector.

  2. INSTALL NO. 1 INTAKE MANIFOLD INSULATOR

    A0117GE

    1. Temporarily install the intake manifold insulator with a new gasket, the 2 bolts and the nut.

  3. INSTALL INTAKE MANIFOLD


    1. A0117G9

      Install the stud bolt on the intake manifold.

    2. A011947

      Install a new gasket on the intake manifold.

    3. A011BHX

      Temporarily install the intake manifold with the 2 bolts and 2 nuts.

    4. A011A6ME01

      Tighten the 4 bolts and 3 nuts in the sequence shown in the illustration.

      Torque:
      30 N*m  { 306 kgf*cm, 22 ft.*lbf }
    5. A0116VX

      Connect the union to check valve hose with the hose clamp.

    6. Connect the vacuum hose.

    7. Connect the ventilation hose with the hose clamp.

    8. A0117YN

      Tighten the 2 bolts.

      Torque:
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
    9. Engage the 4 wire harness clamps and install the wire harness to the intake manifold.

    10. Connect the vacuum sensor connector.

    11. A011BVW

      Install the 2 water by-pass hoses on the intake manifold.

    12. Connect the fuel vapor feed hose with the hose clamp.

    13. Connect the vacuum switching valve connector

  4. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY


    1. Install the throttle body assembly Click here.

  5. INSTALL WINDSHIELD WIPER MOTOR AND LINK


    1. Install the windshield wiper motor and link Click here.