COMBINATION METER INSTALLATION


  1. INSTALL COMBINATION METER ASSEMBLY


    1. Connect the 2 connectors.

    2. Engage the 2 clips.

    3. A011BSS

      Install the combination meter with 2 screws.

  2. INSTALL INSTRUMENT CLUSTER FINISH NO. 1 PANEL

    A011B9S

    1. Engage the 9 clips and install the instrument cluster finish No. 1 panel.

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }

    Note

    When the power to the combination meter is disconnected and reconnected, it will not function normally until 5 minutes elapse or a vehicle speed signal is input.