INSTALL COMBINATION METER ASSEMBLY
Connect the 2 connectors.
Engage the 2 clips.
Install the combination meter with 2 screws.
INSTALL INSTRUMENT CLUSTER FINISH NO. 1 PANEL
Engage the 9 clips and install the instrument cluster finish No. 1 panel.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When the power to the combination meter is disconnected and reconnected, it will not function normally until 5 minutes elapse or a vehicle speed signal is input.