INSTALL STEERING RACK END SUB-ASSEMBLY
| *1 | Fulcrum Length |
Using SST, install the 2 steering rack end sub-assembly.
Note
Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).
This torque value is effective when SST parallel to a torque wrench.
INSTALL TIE ROD SUB-ASSEMBLY LH
| *1 | Matchmarks |
Install the lock nut and the tie rod sub-assembly LH onto the steering rack end sub-assembly until the matchmarks are aligned.
Tighten the 2 lock nuts.
INSTALL TIE ROD SUB-ASSEMBLY RH
Tech Tips
Use the same procedure for the LH side.
INSTALL TIE ROD END SUB-ASSEMBLY LH
| *1 | Matchmarks |
Install the lock nut and the tie rod end sub-assembly LH onto the tie rod sub-assembly until the matchmarks are aligned.
Tech Tips
After adjusting toe-in, tighten the lock nut.
INSTALL TIE ROD END SUB-ASSEMBLY RH
Tech Tips
Use the same procedure for the LH side.
INSTALL STEERING GEAR HEAT INSULATOR (for 1ND-TV)
| *1 | Guide |
Install the steering gear heat insulator onto the steering gear and match the guide as shown in the illustration.
Install the 2 bolts.