YAW RATE AND ACCELERATION SENSOR INSTALLATION


  1. INSTALL YAW RATE AND ACCELERATION SENSOR


    1. A011825

      Connect the connector to the yaw rate and acceleration sensor.

      Note

      Make sure that the yaw rate and acceleration sensor connector is connected securely.

    2. Insert the yaw rate and acceleration sensor with the 2 bolts.

      Torque:
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }

      Note


      • Do not damage the yaw rate and acceleration sensor.

      • Make sure that the yaw rate and acceleration sensor is installed securely.

  2. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (for Manual Transaxle)

    A0118HP

    1. Install the shifting hole cover onto the shift lever.

    2. Engage the 8 claws and install the console upper panel.

  3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (for CVT)


    1. A0118XU

      Engage the 8 claws and install the console upper panel.

  4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transaxle)

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }
  6. PERFORM YAW RATE AND ACCELERATION SENSOR ZERO POINT CALIBRATION

    Click here

  7. CHECK VSC SENSOR SIGNAL

    Click here