PURGE VALVE INSTALLATION


  1. INSTALL DUTY VACUUM SWITCHING VALVE


    1. Install the duty vacuum switching valve with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the vacuum hose and the purge hose.

    3. Connect the duty vacuum switching valve connector.