INTEGRATION RELAY INSTALLATION


  1. INSTALL INTEGRATION RELAY


    1. Connect the 4 connectors to the integration relay.

    2. Engage the 2 claws and install the integration relay.

    3. Connect the 2 connectors to the integration relay.

    4. Install the fusible link cover.