INSPECT INTEGRATION NO.1 RELAY
Check the resistance (ECD relay).
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the vacuum switching valve assembly.
Check the resistance (IG2 relay).
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|
If the result is not as specified, replace the vacuum switching valve assembly.