DESCRIPTION
| Detection Item | Symptom | Trouble Area |
|---|---|---|
| ECM Communication Stop Mode | Either condition is met:
|
|
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
CHECK HARNESS AND CONNECTOR (ECM - BATTERY AND BODY GROUND)
Disconnect the A40 and B39 ECM connectors.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
|
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | Proceed to |
|---|---|
| OK (for 1AD-FTV) | A |
| OK (for 2AD-FTV) | B |
| OK (for 2AD-FHV) | C |
| NG | D |
| *1 | Front view of harness connector (to ECM) |
| B |
|
REPLACE ECM Click here |
| C |
|
REPLACE ECM Click here |
| D |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| A |
|
REPLACE ECM Click here