DIFFERENTIAL CASE REASSEMBLY


  1. INSTALL FRONT DIFFERENTIAL RING GEAR


    1. A010ONCE03

      Clean the contact surfaces of the front differential case and ring gear.

    2. Heat the front differential ring gear to 90 to 110°C (194 to 230°F) in boiling water.

    3. A010SL3E03
      Text in Illustration
      *1 Matchmark

      After the moisture on the ring gear has completely evaporated, quickly align the matchmarks on the ring gear and the differential case and install the ring gear to the differential case.

    4. Install the 16 bolts.

      Torque:
      106 N*m  { 1081 kgf*cm, 78 ft.*lbf }
  2. INSTALL FRONT DIFFERENTIAL CASE FRONT TAPERED ROLLER BEARING


    1. A010QNZE01

      Using SST and a press, press in a new front tapered roller bearing.

      SST
      09309-14010
  3. INSTALL FRONT DIFFERENTIAL CASE REAR TAPERED ROLLER BEARING


    1. A010NGME01

      Using SST and a press, press in a new rear tapered roller bearing.

      SST
      09554-22010