INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
Install the control cable assembly through the floor hole.
Attach the 2 claws to connect the shift control cable and select control cable to the floor shift lever assembly.
Attach the grommet of the control cable assembly with the 2 nuts.
Connect the end of the shift control cable to the shift lever assembly and install the clip.
Attach the bracket of the control cable assembly with the bolt.
Connect the 2 cables to the control cable bracket with 2 new clips.
Connect the 2 cables to the transaxle and install the 2 clips.
Release the lock of the cable length adjustment structure of the select cable.
Twist the stopper.
Pull the lock piece outward from the case to release the lock.
Pressing the shift and select lever shaft (*1) and pin (*2), push in pin (*3) and check that the shift and select lever shaft is secured at the 1st-2nd gear selected position (the shaft comes to a stop at the position 8 mm (0.315 in.) below the N position).
Connect the end of the select control cable to the shift lever assembly and install the clip.
Note
Make sure the lock piece of the select control cable is facing upward when the select control cable is connected.
Make sure the clip is inserted in the direction shown in the illustration.
| *1 | Slider |
| *2 | Inhibitor Wall |
Push the slider against the inhibitor wall.
Note
Do not pull up the slider.
When adjusting the cable, make sure that the shift lever is not in 1 or 2.
Lock the cable length adjustment structure of the select cable.
Push the lock piece into the case with slider held against the inhibitor wall.
Return the stopper to prevent the lock from being released.
Note
Push in the lock piece completely.
Make sure the cable length adjustment structure is locked securely.
Release the pin that fixes the transmission outer lever.
Pull the pin toward the left front side of the vehicle.
INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR
Install the front No. 1 floor heat insulator with the 3 nuts.
INSTALL CONSOLE BOX ASSEMBLY
INSTALL AIR CLEANER CASE
Install the air cleaner case with the 3 bolts.
INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
INSTALL AIR CLEANER CAP SUB-ASSEMBLY
Connect the air cleaner hose.
Attach the 4 clamps to install the air cleaner cap.
Connect the No. 2 ventilation hose.
Connect the mass air flow meter connector.
INSTALL BATTERY CARRIER
Install the battery carrier with the 4 bolts.
Attach the 2 clamps to connect the wire harness.
INSTALL BATTERY TRAY
INSTALL BATTERY
INSTALL BATTERY CLAMP SUB-ASSEMBLY
Attach the hook of the battery clamp to the battery carrier.
Partially tighten the nut and temporarily install the bolt.
Adjust the battery clamp position.
Tighten the nut and bolt.
INSTALL NO. 1 ENGINE COVER
Attach the 4 clips to install the No. 1 engine cover.
INSTALL RADIATOR SUPPORT OPENING COVER
Install the radiator support opening cover with the 7 clips.
INSTALL FRONT EXHAUST PIPE ASSEMBLY
Install the front exhaust pipe assembly Click here.