ECD SYSTEM (for CCo) Injector Circuit

DESCRIPTION

The injector driver drives the injectors at high speeds with a high-voltage DC/DC converter. The ECM constantly monitors the injector driver and stops the engine if an abnormal condition is detected.

WIRING DIAGRAM

Refer to DTC P062D Click here.

INSPECTION PROCEDURE

Note


  • After replacing the ECM, the new ECM needs registration Click here and initialization Click here.

  • Inspect the fuses of circuits related to this system before performing the following inspection procedure.

PROCEDURE


  1. CHECK EDU (POWER SOURCE)


    1. A00EA01E01
      Text in Illustration
      *1

      Front view of wire harness connector

      (to Injector Driver (EDU))

      Disconnect the injector driver (EDU) connectors.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Switch Condition Specified Condition
      B68-2 (+B) - B68-4 (GND) Ignition switch ON 11 to 14 V

    NG
    OK
  2. INSPECT INTEGRATION NO.1 RELAY (EDU RELAY)


    1. Inspect the integration relay (EDU relay) Click here.


    NG
    OK
  3. CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - EDU)

    A00E7RXE01
    Text in Illustration
    *1

    Front view of wire harness connector

    (to EDU)

    *2 Engine Room No. 1 Relay Block
    *3

    Front view of wire harness connector

    (to Integration Relay)


    1. Remove the integration relay from the engine room No. 1 relay block.

    2. Disconnect the EDU connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance (Check for Open)
      Tester Connection Condition Specified Condition
      B68-2 (+B) - 1B-8 Always Below 1 Ω
      B68-4 (GND) - Body ground Always Below 1 Ω
      Standard Resistance (Check for Short)
      Tester Connection Condition Specified Condition
      B68-2 (+B) or 1B-8 - Body ground Always 10 kΩ or higher
    4. Reconnect the EDU connector.

    5. Reinstall the integration relay.


    NG
    OK
  4. CHECK HARNESS AND CONNECTOR (ENGINE ROOM NO. 1 RELAY BLOCK)

    A00E7HSE02
    Text in Illustration
    *1 Engine Room No. 1 Relay Block
    *2

    Front view of wire harness connector

    (to Integration Relay)


    1. Remove the integration relay from the engine room No. 1 relay block.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance (Check for Open)
      Tester Connection Condition Specified Condition
      1B-4 - 1B-6 Always Below 1 Ω
      Standard Resistance (Check for Short)
      Tester Connection Condition Specified Condition
      1B-4 or 1B-6 - Body ground Always 10 kΩ or higher
    3. Reinstall the integration relay.


    NG
    OK
  5. CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - ECM)

    A00E6S4E01
    Text in Illustration
    *1

    Front view of wire harness connector

    (to ECM)

    *2 Engine Room No. 1 Relay Block
    *3

    Front view of wire harness connector

    (to Integration Relay)


    1. Remove the integration relay from the engine room No. 1 relay block.

    2. Disconnect the ECM connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance (Check for Open)
      Tester Connection Condition Specified Condition
      A40-44 (IREL) - 1B-7 Always Below 1 Ω
      Standard Resistance (Check for Short)
      Tester Connection Condition Specified Condition
      A40-44 (IREL) or 1B-7 - Body ground Always 10 kΩ or higher
    4. Reconnect the ECM connector.

    5. Reinstall the integration relay.


    NG
    OK