REFRIGERANT LINE INSTALLATION

PROCEDURE


  1. INSTALL PIPING CLAMP


    1. Remove the vinyl tape from the cooler refrigerant liquid pipe A and liquid tube sub-assembly A.

    2. Sufficiently apply compressor oil to 2 new O-rings and the fitting surfaces of the liquid tube sub-assembly A.

      Refrigerant Compressor Oil
      HFC-134a (R134a) ND-OIL 8 or equivalent
      HFO-1234yf (R1234yf) ND-OIL 12 or equivalent
    3. Install the 2 O-rings to the liquid tube sub-assembly A.

    4. Install the cooler refrigerant liquid pipe A to the liquid tube sub-assembly A.

    5. A01R3LMC02
      *a Correct
      *b Incorrect
      *c No Gap
      *d Gap

      Install the piping clamp to the cooler refrigerant liquid pipe A.

      Note

      Make sure that the piping clamp is engaged securely with no gap.

  2. INSTALL HEADLIGHT ASSEMBLY LH (for Triple Beam Headlight)

    Click here

  3. INSTALL HEADLIGHT ASSEMBLY LH (for Single Beam Headlight)

    Click here

  4. CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT (for HFC-134a(R134a))

    Click here

  5. CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT (for HFO-1234yf(R1234yf))

    Click here

  6. WARM UP ENGINE (for HFC-134a(R134a))

    Click here

  7. WARM UP ENGINE (for HFO-1234yf(R1234yf))

    Click here

  8. INSPECT FOR REFRIGERANT LEAK (for HFC-134a(R134a))

    Click here

  9. INSPECT FOR REFRIGERANT LEAK (for HFO-1234yf(R1234yf))

    Click here