CAUTION / NOTICE / HINT
Tech Tips
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE
INSTALL NETWORK GATEWAY ECU
Align the holes of the network gateway ECU with the pins of the blower assembly and install the network gateway ECU with the 2 bolts.
Connect the network gateway ECU connector.
INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY
INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
INSTALL FRONT NO. 2 CONSOLE BOX INSERT (for LHD)
INSTALL FRONT NO. 1 CONSOLE BOX INSERT (for RHD)
INSTALL INSTRUMENT PANEL FINISH PANEL END RH (for LHD)
INSTALL INSTRUMENT PANEL FINISH PANEL END LH (for RHD)
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.