TOE CONTROL LINK ON-VEHICLE INSPECTION

PROCEDURE


  1. INSPECT TOE CONTROL LINK SUB-ASSEMBLY


    1. Check for looseness.


      1. Lift up the vehicle.

      2. A01F7II

        Move the toe control link sub-assembly up and down then left and right by hand to check that there is no looseness at the toe control link sub-assembly.