TCM(for 2GR) INSTALLATION

PROCEDURE


  1. INSTALL TCM


    1. Install the 2 brackets to the TCM with the 4 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
    2. B0074RPC02
      *a Name Plate
      B0077IM Vehicle Front

      Install the TCM to the engine room ECM box with the 2 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }

      Note


      • Install the TCM to the engine room ECM box with the name plate facing the inside of the vehicle.

      • Make sure that water and foreign matter do not enter the engine room ECM box when the engine room ECU cover is off.

      • If the TCM has been dropped or subjected to severe impact, or there any cracks, dents or other defects on the TCM housing, replace the TCM with a new one.

      • Make sure that the stud bolts are securely installed to the engine room ECM box.

    3. Connect the 2 TCM connectors.

      Note

      Be sure to securely connect the 2 TCM connectors.

    4. Connect the 2 ECM wire harness connectors.

      Note

      Be sure to securely connect the 2 ECM connectors.

    5. Connect the connector holder and grommet to the engine room ECM box.

    6. Engage the claw.

      Note

      Be sure to securely engage the claw.

    7. B00753I

      Engage the claw to connect the junction connector to the connector holder.

      Note

      Be sure to securely engage the claw.

    8. Connect the 2 engine wire connectors to the connector holder.

      Note

      Be sure to securely connect the 2 engine connectors.

  2. INSTALL ENGINE ROOM ECU COVER

    Click here

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  4. RESET MEMORY

    Click here