PROCEDURE
REMOVE NO. 1 ENGINE UNDER COVER ASSEMBLY
DRAIN ENGINE COOLANT
DRAIN ENGINE OIL
REMOVE V-BANK COVER SUB-ASSEMBLY
REMOVE ENGINE ROOM SIDE COVER
REMOVE COOL AIR INTAKE DUCT SEAL
REMOVE INLET NO. 1 AIR CLEANER
DISCONNECT WATER BY-PASS HOSE
Disconnect the 2 water by-pass hoses.
REMOVE OIL COOLER ASSEMBLY
Remove the 2 bolts, 2 nuts and oil cooler assembly.
Remove the 2 gaskets.