PROCEDURE
INSTALL NO. 5 ENGINE WIRE
Engage the 2 clamps to install the No. 5 engine wire to the oil cooler assembly.
INSTALL OIL COOLER ASSEMBLY
Apply a small amount of engine oil to 2 new O-rings.
Install the 2 O-rings to the stiffening crankcase assembly.
Install the oil cooler assembly to the stiffening crankcase assembly with the 4 bolts in several steps in the order shown in the illustration.
| *1 | No. 4 Water By-pass Hose |
| *2 | No. 5 Water By-pass Hose |
| *a | LH Side |
| *b | Up |
| *c | 45° |
| *d | Paint |
Connect the No. 4 water by-pass hose and No. 5 water by-pass hose to the oil cooler assembly and slide the 2 clips to secure them.
Tech Tips
Engage the clips within the area shown in the illustration.
Connect the 2 No. 5 engine wire connectors.
INSTALL COMPRESSOR AND MAGNETIC CLUTCH
INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY