PROCEDURE
INSTALL STUD BOLT
Tech Tips
If a stud bolt is deformed or the threads are damaged, replace it.
Using an E6 "TORX" socket wrench, install the 2 stud bolts to the intake manifold.
INSTALL INTAKE MANIFOLD
Install a new No. 1 intake manifold to head gasket to each cylinder head sub-assembly.
Note
Align the port holes of the No. 1 intake manifold to head gaskets with those of the cylinder head sub-assembly.
Make sure that the 2 No. 1 intake manifold to head gaskets are installed in the correct direction.
Temporarily install the intake manifold to the cylinder head sub-assembly with the 4 bolts and 4 nuts.
|
Bolt |
|
Nut |
|
Front |
Tighten the 4 bolts and 4 nuts in the order shown in the illustration.
INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
CONNECT ENGINE WIRE
CONNECT FUEL TUBE SUB-ASSEMBLY
INSTALL INTAKE AIR SURGE TANK ASSEMBLY
Note
Do not apply oil to the following bolts and nuts:
| Oil Application Prohibited Bolt and Nut |
|---|
| Bolt and Nut for Intake Air Surge Tank Assembly and Intake Manifold |
| Bolt for No. 2 Surge Tank Stay and Intake Air Surge Tank Assembly |
Install the plug to the intake air surge tank assembly and slide the clip to secure it.
Install a new air surge tank to intake manifold gasket to the intake air surge tank assembly.
Temporarily install the intake air surge tank assembly to the intake manifold with the 6 bolts and 2 nuts.
|
Bolt |
|
Nut |
Using a 5 mm hexagon socket wrench, tighten the 6 bolts in the order shown in the illustration.
Tighten the 2 nuts in the order shown in the illustration.
Connect the No. 2 surge tank stay to the intake air surge tank assembly with the bolt.
Connect the No. 3 water by-pass pipe to the intake air surge tank assembly with the bolt.
for RHD:
Engage the wire harness clamp to the intake air surge tank assembly.
Engage the 4 wire harness clamps to the intake air surge tank assembly.
Connect the No. 2 water by-pass hose to the intake air surge tank assembly clamp.
Connect the union to check valve hose to the intake air surge tank assembly and slide the clip to secure it.
Connect the ventilation hose assembly to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.
Install the purge valve (purge VSV) to the intake air surge tank assembly with the bolt.
Connect the No. 1 fuel vapor feed hose to the purge valve (purge VSV).
Connect the purge valve (purge VSV) connector.
INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY
INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
INSPECT FOR FUEL LEAK