PROCEDURE
REPLACE RING PIN
Tech Tips
It is not necessary to remove the ring pins unless they are being replaced.
Remove the 14 ring pins.
Using a plastic hammer, install 14 new ring pins.
| *a | Top Side | *b | Bottom Side |
| *c | LH Side | *d | Protrusion Height |
| *e | 15 mm (0.591 in.) | *f | 14 mm (0.551 in.) |
| *g | 12 mm (0.472 in.) | *h | 11 mm (0.433 in.) |
| *i | 8 mm (0.315 in.) | - | - |
| Standard Protrusion Height | ||||||
|---|---|---|---|---|---|---|
|
REPLACE STRAIGHT PIN
Tech Tips
It is not necessary to remove the straight pins unless they are being replaced.
Remove the 8 straight pins.
Using a plastic hammer, install 8 new straight pins.
| *a | Front Side | *b | Rear Side |
| *c | LH Side | *d | Bottom Side |
| *e | Protrusion Height | *f | 6 mm (0.236 in.) |
| *g | 22 mm (0.866 in.) | *h | 10 mm (0.394 in.) |
| *i | 14 mm (0.551 in.) | - | - |
| Standard Protrusion Height | ||||||
|---|---|---|---|---|---|---|
|