PROCEDURE
REPLACE INTAKE VALVE GUIDE BUSH
Heat the cylinder head sub-assembly to between 80 and 100°C (176 and 212°F).
Note
Be sure to wear protective gloves.
Place the cylinder head sub-assembly on wooden blocks.
Using SST and a hammer, tap out the intake valve guide bush.
Using a caliper gauge, measure the intake valve guide bush bore diameter of the cylinder head sub-assembly.
| Standard Intake Valve Guide Bush Bore Diameter |
|---|
| 10.285 to 10.306 mm (0.405 to 0.406 in.) |
| Select a new intake valve guide bush (STD or O/S 0.05) | ||||||
|---|---|---|---|---|---|---|
|
If the intake valve guide bush bore diameter of the cylinder head sub-assembly is more than 10.306 mm (0.40575 in.), machine the intake valve guide bush bore of the cylinder head sub-assembly to a dimension of 10.335 to 10.356 mm (0.40689 to 0.40772 in.) to install an O/S 0.05 intake valve guide bush.
If the intake valve guide bush bore diameter of the cylinder head sub-assembly is more than 10.356 mm (0.40772 in.), replace the cylinder head sub-assembly.
Heat the cylinder head sub-assembly to between 80 and 100°C (176 and 212°F).
Note
Be sure to wear protective gloves.
| *a | Protrusion Height |
Using SST and a hammer, tap in the selected intake valve guide bush.
| Standard Protrusion Height |
|---|
| 14.85 to 15.10 mm (0.585 to 0.594 in.) |
Using a sharp 5.5 mm reamer, ream the intake valve guide bush to obtain the standard oil clearance.
| Standard Oil Clearance |
|---|
| 0.025 to 0.060 mm (0.000984 to 0.00236 in.) |
REPLACE EXHAUST VALVE GUIDE BUSH
Heat the cylinder head sub-assembly to between 80 and 100°C (176 and 212°F).
Note
Be sure to wear protective gloves.
Place the cylinder head sub-assembly on wooden blocks.
Using SST and a hammer, tap out the exhaust valve guide bush.
Using a caliper gauge, measure the exhaust valve guide bush bore diameter of the cylinder head sub-assembly.
| Standard Exhaust Valve Guide Bush Bore Diameter |
|---|
| 10.285 to 10.306 mm (0.405 to 0.406 in.) |
| Select a new exhaust valve guide bush (STD or O/S 0.05) | ||||||
|---|---|---|---|---|---|---|
|
If the exhaust valve guide bush bore diameter of the cylinder head sub-assembly is more than 10.306 mm (0.40575 in.), machine the exhaust valve guide bush bore of the cylinder head sub-assembly to a dimension of 10.335 to 10.356 mm (0.40689 to 0.40772 in.) to install an O/S 0.05 exhaust valve guide bush.
If the exhaust valve guide bush bore diameter of the cylinder head sub-assembly is more than 10.356 mm (0.40772 in.), replace the cylinder head sub-assembly.
Heat the cylinder head sub-assembly to between 80 and 100°C (176 and 212°F).
Note
Be sure to wear protective gloves.
| *a | Protrusion Height |
Using SST and a hammer, tap in the selected exhaust valve guide bush.
| Standard Protrusion Height |
|---|
| 19.25 to 19.50 mm (0.758 to 0.768 in.) |
Using a sharp 5.5 mm reamer, ream the exhaust valve guide bush to obtain the standard oil clearance.
| Standard Oil Clearance |
|---|
| 0.030 to 0.065 mm (0.00118 to 0.00256 in.) |
REPLACE SPARK PLUG TUBE
Note
When using a new cylinder head sub-assembly, the spark plug tubes must be replaced.
| *a | Adhesive 1324 |
| *b | Application Width |
| *c | Distance |
Apply adhesive to a new spark plug tube as shown in the illustration.
| Adhesive |
|---|
| Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent |
| Standard Application Width |
|---|
| 1.0 to 3.0 mm (0.0394 to 0.118 in.) |
| Distance |
|---|
| 1.0 to 7.0 mm (0.0394 to 0.276 in.) |
Note
Install the spark plug tube within 3 minutes after applying adhesive.
Be careful not to deform the spark plug tube.
Be careful not to expose the seal to engine oil for at least 1 hour after installing it.
| *a | Protrusion Height |
Using a wooden block and hammer, tap in the spark plug tube to the standard protrusion height.
| Standard Protrusion Height |
|---|
| 112 mm (4.41 in.) |
Note
To avoid tapping in the spark plug tube too far, measure the protrusion height while tapping it.
REPLACE RING PIN
Tech Tips
It is not necessary to remove the ring pins unless they are being replaced.
Remove the 2 ring pins.
| *a | Protrusion Height |
Using a plastic hammer, tap in 2 new ring pins to the cylinder head sub-assembly.
| Standard Protrusion Height |
|---|
| 6.5 to 7.5 mm (0.256 to 0.295 in.) |