DESCRIPTION
The main power source is supplied to the air conditioning amplifier assembly when the engine switch is on (IG). The power source is used for operating the air conditioning amplifier assembly and servo motor, etc.
WIRING DIAGRAM
INSPECTION PROCEDURE
Tech Tips
Start the engine before inspection. Check the relay or battery if the entry and start system does not start.
PROCEDURE
INSPECT FUSE (ECU-IG NO. 2)
Remove the ECU-IG NO. 2 fuse from the cowl side junction block LH.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE FUSE |
| OK |
|
CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BATTERY AND BODY GROUND)
Disconnect the E35 amplifier connector.
Disconnect the E36 amplifier connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||||
|---|---|---|---|---|---|---|---|---|
|
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPLACE AIR CONDITIONING AMPLIFIER ASSEMBLY Click here