CLEARANCE WARNING BUZZER INSTALLATION

Tech Tips


  • Use the same procedures for LHD and RHD vehicles.

  • The procedures listed below are for LHD vehicles.


  1. INSTALL NO. 1 CLEARANCE WARNING BUZZER

    A01ES8J

    1. Attach the clamp to install the No. 1 clearance warning buzzer.

    2. Connect the connector.

  2. INSTALL DRIVER SIDE KNEE AIRBAG ASSEMBLY


    1. A01ENCE

      Connect the connector.

      Note

      When handling the airbag connector, take care not to damage the airbag wire harness.

    2. Install the driver side knee airbag with the 5 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  3. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL

    A01EN2R

    1. Connect the connectors.

    2. Attach the 2 claws to install the sensor.

    3. A01EQEE

      Attach the 2 claws to connect the 2 control cables.

    4. A01EQBC

      Attach the 16 claws to install the finish panel.

    5. A01EOJD

      Install the 2 bolts.

    6. A01ENQK

      Attach the 2 claws to close the hole cover.

  4. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY


    1. A01EQBL

      Connect the connectors.

    2. Attach the 3 claws to install the under cover.

    3. Install the 2 screws.

  5. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH


    1. A01EO0Q

      Connect the connector.

    2. Attach the 8 claws to install the panel pad.

  6. INSTALL NO. 1 SWITCH HOLE BASE


    1. A01EQ09

      Connect the connectors.

    2. Attach the 5 claws to install the switch hole base.

  7. INSTALL INSTRUMENT SIDE PANEL LH


    1. A01EQQM

      Attach the 6 claws to install the side panel.

  8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  9. INSTALL ENGINE ROOM SIDE COVER LH


    1. Install the engine room side cover LH with the 7 clips.