INSTALL FUEL LID LOCK CONTROL CABLE SUB-ASSEMBLY
Connect the cable to the clamps shown in the illustration to install the cable.
INSTALL FUEL FILLER OPENING LID LOCK RETAINER
Install the lock retainer and turn it clockwise as shown in the illustration.
Install the cable to the retainer and turn it clockwise as shown in the illustration.
INSTALL FUEL LID LOCK OPEN LEVER SUB-ASSEMBLY
Connect the fuel lid lock control cable to the fuel lid lock open lever.
Attach the 2 claws to install the fuel lid lock open lever.
INSTALL NO. 1 WOOFER BOX SPEAKER ASSEMBLY (for 19 Speakers)
Install the box speaker with the 5 bolts.
Connect the connector.
INSTALL FRONT QUARTER TRIM PANEL ASSEMBLY RH
INSTALL FRONT FLOOR CARPET ASSEMBLY
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
CHECK SRS WARNING LIGHT
INSTALL ENGINE ROOM SIDE COVER LH
Install the engine room side cover LH with the 7 clips.