Tech Tips
A bolt without a torque specification is shown in the standard bolt chart Click here.
INSTALL COOLING BOX ASSEMBLY
Attach the 2 claws.
Connect the connector.
Sufficiently apply compressor oil to 2 new O-rings.
| Compressor oil |
|---|
| ND-OIL 8 or equivalent |
Install the 2 O-rings to the 2 cooler pipes.
Connect the 2 cooler pipes with the 2 bolts.
Install the cooling box with the 4 bolts and 2 screws.
INSTALL REAR CONSOLE END PANEL SUB-ASSEMBLY
Connect the connectors and 3 clamps.
Attach the 6 claws to install the end panel.
INSTALL NO. 1 COOLER COVER
Attach the claw on the upper part of the cooler cover, and then attach the clamp on the lower part of the cooler cover to install it.
INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
Connect the connectors.
Attach the 13 claws to install the console panel.
INSTALL CONSOLE CUP HOLDER BOX SUB-ASSEMBLY
Attach the 4 claws to install the box.
INSTALL PARKING BRAKE HOLE COVER
Attach the 6 claws to install the cover.
INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Connect the connectors.
Attach the 8 claws to install the panel.
INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
Install the shift lever knob and twist it in the direction indicated by the arrow.
INSTALL INNER NO. 1 INSTRUMENT PANEL BRACKET COVER RH
Attach the clip to install the cover.
INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH
Attach the 9 claws to install the panel pad.
INSTALL INNER NO. 1 INSTRUMENT PANEL BRACKET COVER LH
Attach the clip to install the cover.
Install the clip.
INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH
Connect the connector.
Attach the 8 claws to install the panel pad.
INSTALL FRONT SEAT ASSEMBLY LH
Install the front seat assembly LH Click here.
CHARGE REFRIGERANT
Perform vacuum purging using a vacuum pump.
Charge refrigerant HFC-134a (R134a).
| Condenser Core Thickness | Cool Box | Refrigerant Charging Amount |
|---|---|---|
| 22 mm (0.866 in.) | w/ Cool Box | 1010 +/-30 g (35.6 +/-1.1 oz.) |
| w/o Cool Box | 970 +/-30 g (34.2 +/-1.1 oz.) | |
| 16 mm (0.630 in.) | w/ Cool Box | 970 +/-30 g (34.2 +/-1.1 oz.) |
| w/o Cool Box | 920 +/-30 g (32.5 +/-1.1 oz.) |
Note
Do not operate the cooler compressor before charging refrigerant as the cooler compressor will not work properly without any refrigerant, and will overheat.
Approximately 100 g (3.53 oz.) of refrigerant may need to be charged after bubbles disappear. The refrigerant amount should be checked by measuring its quantity, and not with the sight glass.
WARM UP ENGINE
Warm up the engine at less than 1850 rpm for 2 minutes or more after charging the refrigerant.
Note
Be sure to warm up the compressor when turning the A/C switch on after removing and installing the cooler refrigerant lines (including the compressor), to prevent damage to the compressor.
CHECK FOR REFRIGERANT GAS LEAK
After recharging the refrigerant gas, check for refrigerant gas leakage using a halogen leak detector.
Perform the operation under these conditions:
Stop the engine.
Secure good ventilation (the halogen leak detector may react to volatile gases other than refrigerant, such as evaporated gasoline or exhaust gas).
Repeat the test 2 or 3 times.
Make sure that some refrigerant remains in the refrigeration system. When compressor is off: approximately 392 to 588 kPa (4.0 to 6.0 kgf/cm2, 57 to 85 psi).
Using a halogen leak detector, check the refrigerant line for leakage.
If a gas leak is not detected on the drain hose, remove the blower motor control (blower resistor) from the cooling unit. Insert the halogen leak detector sensor into the unit and perform the test.
Disconnect the connector and wait for approximately 20 minutes. Bring the halogen leak detector close to the pressure switch and perform the test.
INSTALL UPPER RADIATOR SUPPORT SEAL
Install the upper radiator support seal with the 3 clips.
INSTALL ENGINE ROOM SIDE COVER RH
Install the engine room side cover RH with the 7 clips.
INSTALL ENGINE ROOM SIDE COVER LH
Install the engine room side cover LH with the 7 clips.