PURGE VALVE INSPECTION


  1. INSPECT PURGE VSV

    A01ER3VE03

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 23 to 26 Ω
      1 - VSV body ground Always 10 kΩ or higher
      2 - VSV body ground 10 kΩ or higher

      If the result is not as specified, replace the purge VSV.

    2. Check the operation of the purge VSV.


      1. A01EORWE03

        Check that air does not flow from port F when air is applied to port E.

      2. A01EQH2E03

        Apply battery voltage to the connector, and check the VSV operation.

        OK
        Measurement Condition Specified Condition

        Battery positive (+) → Terminal 1

        Battery negative (-) → Terminal 2

        Air flows from port E to port F

        If the result is not as specified, replace the purge VSV.