AIR SWITCHING VALVE (for Bank 2) INSTALLATION


  1. INSTALL AIR SWITCHING VALVE ASSEMBLY


    1. A01EPXKE01
      Text in Illustration
      *1 Air Switching Valve
      *2 Claw
      *3 No. 3 Air Tube

      Install a new gasket and the air switching valve with the 3 bolts.

      Torque:
      24 N*m  { 245 kgf*cm, 18 ft.*lbf }

      Note

      Make sure the claws of the gasket are not caught between the air switching valve and No. 3 air tube.

    2. Install the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Attach the wire harness clamp and connect the air switching valve connector.

  2. CONNECT NO. 1 AIR INJECTION SYSTEM HOSE


    1. A01EPIKE01
      Text in Illustration
      *1 Protrusion
      *2 Paint Mark

      Align the paint mark with the projection and connect the No. 1 air injection system hose.

      Tech Tips

      Make sure the direction of the hose clamp is as shown in the illustration.

  3. CONNECT NO. 3 PCV HOSE


    1. Connect the No. 3 PCV hose.

  4. INSTALL AIR CLEANER CAP AND HOSE


    1. Install the air cleaner cap and hose, and then tighten the hose clamp.

      Torque:
      2.5 N*m  { 25 kgf*cm, 22 in.*lbf }
    2. Attach the 4 clamps.

    3. Connect the mass air flow meter connector and attach the clamp.

    4. Connect the No. 2 PCV hose and No. 1 air hose.

  5. INSTALL V-BANK COVER SUB-ASSEMBLY


    1. A01ER0YE01
      Text in Illustration
      *1 Grommet
      *2 Pin
      *3 Hook
      *4 Bracket

      Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

  6. INSTALL ENGINE ROOM SIDE COVER RH


    1. Install the engine room side cover RH with the 7 clips.