CENTER DIFFERENTIAL LOCK SWITCH INSTALLATION


  1. INSTALL CENTER DIFFERENTIAL LOCK SWITCH


    1. A01EQPA

      Attach the 2 claws to install the switch.

  2. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL

    A01EN2R

    1. Connect the connectors.

    2. Attach the 2 claws to install the sensor.

    3. A01EQEE

      Attach the 2 claws to connect the 2 control cables.

    4. A01EQBC

      Attach the 16 claws to install the finish panel.

    5. A01EOJD

      Install the 2 bolts.

    6. A01ENQK

      Attach the 2 claws to close the hole cover.

  3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY


    1. A01EQBL

      Connect the connectors.

    2. Attach the 3 claws to install the under cover.

    3. Install the 2 screws.

  4. INSTALL NO. 1 SWITCH HOLE BASE


    1. A01EQ09

      Connect the connectors.

    2. Attach the 5 claws to install the switch hole base.

  5. INSTALL INSTRUMENT SIDE PANEL LH


    1. A01EQQM

      Attach the 6 claws to install the side panel.

  6. INSTALL INNER NO. 1 INSTRUMENT PANEL BRACKET COVER LH


    1. A01ER40

      Attach the clip to install the cover.

    2. Install the clip.

  7. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH


    1. A01EO0Q

      Connect the connector.

    2. Attach the 8 claws to install the panel pad.