SHIFT LEVER INSTALLATION


  1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY

    A01ER00E02

    1. Install the floor shift with the 4 bolts. Tighten the bolts in the order shown in the illustration.

      Torque:
      14 N*m  { 143 kgf*cm, 10 ft.*lbf }
    2. Install the indoor electrical key oscillator with the screw.

    3. Connect the 2 connectors.

  2. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY

    A01EQZLE01

    1. Turn the control shaft lever RH of the park/neutral position switch counterclockwise until it stops, and then turn it clockwise 2 notches to set it to the N position.

    2. Move the shift lever to N.

    3. A01EQZNE01

      Temporarily install the floor shift gear shifting rod with the nut.

    4. Tighten the nut while lightly pushing the lever rearward.

      Torque:
      13 N*m  { 130 kgf*cm, 9 ft.*lbf }
  3. INSTALL FRONT CONSOLE BOX (w/o Cool Box)


    1. Install the front console box Click here.

  4. INSTALL FRONT CONSOLE BOX (w/ Cool Box)


    1. Install the front console box Click here.

  5. INSPECT SHIFT LEVER POSITION


    1. When moving the shift lever from P to R with the engine switch on (IG) and the brake pedal depressed, make sure that it moves smoothly and correctly into position.

    2. Check that the shift lever does not stop when moving the shift lever from R to P, and check that the shift lever does not stick when moving the shift lever from D to S.

    3. Start the engine and make sure that the vehicle moves forward after moving the shift lever from N to D and moves rearward after moving the shift lever to R.

      If the operation cannot be performed as specified, inspect the park/neutral position switch assembly and check the shift lever assembly installation condition.