| DTC Code | DTC Name |
|---|---|
| P0982 | Shift Solenoid "D" Control Circuit Low (Shift Solenoid Valve S4) |
| P0983 | Shift Solenoid "D" Control Circuit High (Shift Solenoid Valve S4) |
DESCRIPTION
Shifting from 1st to 6th is performed in combination with the ON and OFF operation of shift solenoid valves SL1, SL2, S1, S2, S3, S4 and SR, which are controlled by the ECM. If an open or short circuit occurs in any of the shift solenoid valves, the ECM controls the remaining normal shift solenoid valves to allow the vehicle to be operated safely. Also, the ECM stops sending current to the open or short circuited shift solenoid valve Click here.
| DTC Code | DTC Detection Condition | Trouble Area |
|---|---|---|
| P0982 | The ECM detects a short in the shift solenoid valve S4 circuit 2 times when shift solenoid valve S4 is operated (1 trip detection logic). |
|
| P0983 | The ECM detects an open in the shift solenoid valve S4 circuit 2 times when shift solenoid valve S4 is not operated (1 trip detection logic). |
|
MONITOR DESCRIPTION
These DTCs indicate an open or short in the shift solenoid valve S4 circuit. When there is an open or short circuit in any shift solenoid valve circuit, the ECM detects the problem, illuminates the MIL and stores the DTC. When shift solenoid valve S4 is ON, if its resistance is 8 Ω or less, the ECM determines there is a short in the shift solenoid valve S4 circuit.
When shift solenoid valve S4 is OFF, if its resistance is 100 kΩ or higher, the ECM determines there is an open in the shift solenoid valve S4 circuit Click here.
WIRING DIAGRAM
INSPECTION PROCEDURE
Tech Tips
Shift solenoid valve S4 is turned ON/OFF normally when the shift lever is in D:
| ECM gear shift command | 1st | 2nd | 3rd | 4th | 5th | 6th |
| Shift solenoid valve S4 | OFF | OFF | OFF | OFF | ON | ON |
PROCEDURE
INSPECT NO. 1 TRANSMISSION WIRE (SHIFT SOLENOID VALVE S4)
| *a | Component without harness connected (No. 1 Transmission Wire) |
Disconnect the No. 1 transmission wire connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 TRANSMISSION WIRE - ECM)
| *1 | for LHD |
| *2 | for RHD |
| *a | Front view of wire harness connector (to ECM) |
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
||||||
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPLACE ECM Click here
INSPECT SHIFT SOLENOID VALVE S4
| *a | Component without harness connected (Shift Solenoid Valve S4) |
Remove shift solenoid valve S4.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Apply battery voltage (12 V) to the shift solenoid valve and check that the valve moves and makes an operating noise.
| OK | ||||
|---|---|---|---|---|
|
| NG |
|
REPLACE SHIFT SOLENOID VALVE S4 Click here |
| OK |
|
REPAIR OR REPLACE NO. 1 TRANSMISSION WIRE Click here