VALVE BODY ASSEMBLY INSPECTION


  1. INSPECT SHIFT SOLENOID VALVE SL1

    A01EN87E15

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) with a 21 W bulb → Terminal 1

      Battery negative (-) → Terminal 2

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  2. INSPECT SHIFT SOLENOID VALVE S1

    A01EODPE01

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve S1 connector terminal - Shift solenoid valve S1 body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) → Shift solenoid valve S1 connector

      Battery negative (-) → Shift solenoid valve S1 body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  3. INSPECT SHIFT SOLENOID VALVE S2

    A01EQCQE01

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve S2 connector terminal - Shift solenoid valve S2 body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) → Shift solenoid valve S2 connector

      Battery negative (-) → Shift solenoid valve S2 body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  4. INSPECT SHIFT SOLENOID VALVE S3

    A01EODPE02

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve S3 connector terminal - Shift solenoid valve S3 body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) → Shift solenoid valve S3 connector

      Battery negative (-) → Shift solenoid valve S3 body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  5. INSPECT SHIFT SOLENOID VALVE S4

    A01EQZ3E03

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve S4 connector terminal - Shift solenoid valve S4 body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) → Shift solenoid valve S4 connector

      Battery negative (-) → Shift solenoid valve S4 body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  6. INSPECT SHIFT SOLENOID VALVE SL2

    A01EN87E13

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) with a 21 W bulb → Terminal 1

      Battery negative (-) → Terminal 2

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  7. INSPECT SHIFT SOLENOID VALVE SR

    A01EP4ME01

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      Shift solenoid valve SR connector terminal - Shift solenoid valve SR body 20°C (68°F) 11 to 15 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) → Shift solenoid valve SR connector

      Battery negative (-) → Shift solenoid valve SR body

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  8. INSPECT SHIFT SOLENOID VALVE SLT

    A01ENUKE03

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) with a 21 W bulb → Terminal 2

      Battery negative (-) → Terminal 1

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.

  9. INSPECT SHIFT SOLENOID VALVE SLU

    A01ENUKE04

    1. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω
    2. Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.

      OK
      Measurement Condition Specified Condition

      Battery positive (+) with a 21 W bulb → Terminal 2

      Battery negative (-) → Terminal 1

      Valve moves and makes an operating noise

      If the result is not as specified, replace the solenoid valve.