Click here

ТОПЛИВНЫЙ НАСОС ВЫСОКОГО ДАВЛЕНИЯ ПОВТОРНАЯ СБОРКА

Click here
Click here Click here
  1. Click here

    INSTALL DELIVERY VALVE HOLDER


    1. A00959VE01

      Install 4 new gaskets and the 4 valves to the distributive head.

    2. Install the 4 springs to the 4 delivery valve holders.

    3. Using SST, install the delivery holders.

      09260-54012 09269-54020
      59 N*m 600 kgf*cm 43 in.*lbf
  2. Click here

    INSTALL DISTRIBUTIVE HEAD PLUG


    1. A0098H6E02

      Install a new O-ring to the distributive head plug.

    2. Using SST, install the head plug.

      09260-54012 09262-54010
      88 N*m 900 kgf*cm 65 in.*lbf
  3. Click here

    INSTALL TIMING CONTROL VALVE


    1. A0097MHE02

      Using a 5 mm hexagon wrench, install the timing control valve with the 2 bolts.

      Table 1. Text in Illustration
      *1 5 mm Hexagon Wrench
  4. Click here

    INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE


    1. A0096QM

      Install a new washer and the hollow screw.

      37 N*m 375 kgf*cm 27 in.*lbf
    2. Install 2 new washers and the fuel pipe with the cap nut.

      27 N*m 271 kgf*cm 20 in.*lbf
    3. Install the wiring bracket with the bolt.

      8.0 N*m 82 kgf*cm 71 in.*lbf
  5. Click here

    INSTALL NO. 4 NOZZLE LEAKAGE PIPE


    1. Install 2 new washers and the nozzle leakage pipe with the overflow screw.

      27 N*m 271 kgf*cm 20 in.*lbf