ION GENERATOR INSTALLATION


  1. INSTALL NO. 1 ION GENERATOR SUB-ASSEMBLY (for Front Side)


    1. Install the No. 1 ion generator sub-assembly with the 3 screws.

      Torque:
      2.8 N*m  { 29 kgf*cm, 25 in.*lbf }
    2. Engage the clamp.

    3. Connect the connector.

  2. INSTALL AIR DUCT SUB-ASSEMBLY (for Front Side)


    1. A01CGIIE01
      Text in Illustration
      *1 Instrument Panel Duct Sub-assembly
      *a End of Air Duct Sub-assembly

      Engage the 2 claws and clamp to install the air duct sub-assembly.

    2. Insert the end of the air duct sub-assembly to the instrument panel duct sub-assembly as shown in the illustration.

  3. INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY (for Front Side)

    Click here

  4. INSTALL NO. 2 ION GENERATOR SUB-ASSEMBLY (for Rear Side)


    1. Install the No. 2 ion generator sub-assembly with the 4 screws.

    2. Engage the clamp.

    3. Connect the connector.

  5. INSTALL REAR AIR DUCT SUB-ASSEMBLY (for Rear Side)


    1. A01CBIFE01
      Text in Illustration
      *1 Roof Headlining Holder Cover
      *a End of Rear Air Duct Sub-assembly
      *b Cutout

      Engage the 2 claws and clamp to install the rear air duct sub-assembly.

    2. Attach the end of the rear air duct sub-assembly to the roof headlining holder cover as shown in the illustration.

      Note

      Attach the rear air duct sub-assembly to the roof headlining holder cover with the cutout of the duct facing the RH side of the vehicle.

  6. INSTALL ROOF HEADLINING ASSEMBLY (for Rear Side)

    Click here