PCV VALVE INSTALLATION


  1. INSTALL VENTILATION VALVE SUB-ASSEMBLY


    1. A01CCAVE06

      Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.

      Adhesive
      Toyota genuine adhesive 1324, three bond 1324 or equivalent
    2. A01CFJ2

      Using a 19 mm deep socket wrench, install the ventilation valve sub-assembly.

      Torque:
      27 N*m  { 275 kgf*cm, 20 ft.*lbf }
    3. A01CDST

      Connect the ventilation hose to the ventilation valve sub-assembly.

  2. INSTALL V-BANK COVER SUB-ASSEMBLY


    1. A01CCP4

      Fit the 3 retainers and install the V-bank cover sub-assembly.