PURGE VALVE INSTALLATION


  1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY


    1. A01CBRE

      Install the No. 1 vacuum switching valve assembly with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. A01CCUFE01

      Connect the 2 fuel vapor feed hoses to the No. 1 vacuum switching valve assembly.

    3. Connect the wire harness clamp.

    4. Connect the No. 1 vacuum switching valve assembly connector.

  2. INSTALL V-BANK COVER SUB-ASSEMBLY


    1. A01CCP4

      Fit the 3 retainers and install the V-bank cover sub-assembly.