INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
Install the No. 1 vacuum switching valve assembly with the bolt.
Connect the 2 fuel vapor feed hoses to the No. 1 vacuum switching valve assembly.
Connect the wire harness clamp.
Connect the No. 1 vacuum switching valve assembly connector.
INSTALL V-BANK COVER SUB-ASSEMBLY
Fit the 3 retainers and install the V-bank cover sub-assembly.