Tech Tips
Use the same procedure for RHD and LHD vehicles.
The procedure listed below is for LHD vehicles.
INSTALL SEAT HEATER SWITCH (for Automatic Transmission)
Attach the 4 claws to install the 2 switches.
Connect the 2 connectors.
INSTALL CONSOLE PANEL SUB-ASSEMBLY (for Automatic Transmission)
Connect each connector.
Attach the 8 clips and 2 claws to install the console panel.
INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Automatic Transmission)
| *1 | Shifting Hole Cover |
Install the shift lever knob and twist it in the direction indicated by the arrow.
Install the shifting hole cover to the shift lever knob.
INSTALL SEAT HEATER SWITCH (for Manual Transmission)
Attach the 4 claws to install the 2 switches.
INSTALL FRONT CONSOLE UPPER PANEL GARNISH
Attach the 5 clips to install the front console upper panel garnish.
INSTALL INSTRUMENT PANEL FINISH PANEL END LH
Attach the 4 clips to install the instrument panel finish panel end.
INSTALL INSTRUMENT PANEL FINISH PANEL END RH
Connect the connector.
Attach the 4 clips to install the instrument panel finish panel end.
INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION
Attach the 5 clips to install the No. 2 instrument panel finish panel cushion.
INSTALL NO. 1 INSTRUMENT PANEL FINISH CUSHION
Tech Tips
Use the same procedure described for the No. 2 instrument panel finish panel cushion.
INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY
Connect the connector.
Attach the 4 clips to install the integration control and panel assembly.