INSTALL FLYWHEEL RING GEAR (for Manual Transmission)
| *1 | Chamfer |
| *2 | Ring Gear |
| *3 | Flywheel |
Using a torch, heat the ring gear evenly to approximately 200°C (392°F).
Note
Be careful not to overheat the ring gear.
Using a brass bar, tap the ring gear onto the flywheel with its chamfered gear teeth facing the block.
Note
After installing, allow the ring gear to cool before handling.
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH
Install the front No. 1 engine mounting bracket RH with the 4 bolts.
INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH
Install the front No. 1 engine mounting bracket LH with the 3 bolts.
INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
| *1 | New O-Ring |
Install a new O-ring to the dipstick guide.
Apply a light coat of engine oil to the O-ring.
Push the dipstick guide end into the guide hole.
Install the dipstick guide with the bolt.
Install the dipstick.
INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
Temporarily install the V-ribbed belt tensioner with the 5 bolts.
| Standard Bolt | ||||||
|---|---|---|---|---|---|---|
|
|
Bolt A |
|
Bolt B |
Tighten bolts 1 and 2 in numerical order.
Tighten the other bolts.
INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
for Separate Type:
Install the 2 idler pulley cover plates, 2 No. 2 idler pulleys and 2 No. 2 idler pulley cover plates with the 2 bolts.
for Integrated Type:
Install the 2 No. 2 idler pulleys with the 2 bolts.
INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY
Install the No. 1 idler pulley with the bolt.
Tech Tips
"DOUBLE" is marked on the No. 1 idler pulley to distinguish it from the No. 2 idler pulley.
INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY (w/ Oil Cooler)
| *a | Upward |
| *b | Rearward |
Install the water by-pass pipe with the 3 bolts.
Connect the 2 hoses.
Tech Tips
The direction of the hose clamp is indicated in the illustration.
INSTALL INTAKE MANIFOLD
Set a new gasket on each cylinder head.
Note
Align the port holes of the gasket and cylinder head.
Be careful of the installation direction.
Set the intake manifold on the cylinder heads.
| *1 | Nut |
Install and uniformly tighten the 6 bolts and 4 nuts in several passes.
Tech Tips
Tighten the inner installation bolts of the intake manifold before tightening the outer bolts.
INSTALL FUEL INJECTOR ASSEMBLY
| *1 | New Insulator |
| *2 | New O-Ring |
Install a new insulator to each fuel injector.
Apply a light coat of spindle oil or gasoline to new O-rings and install one to each fuel injector.
Install the 6 injectors.
| *1 | Connector |
|
Outward |
|
Turn |
|
Push |
While turning each fuel injector left and right, install it to the fuel delivery pipe.
Position the fuel injectors with the connectors facing outward.
INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
Place the fuel delivery pipe together with the 6 fuel injectors on the intake manifold.
Temporarily install the 6 bolts, which are used to hold the fuel delivery pipe in place, to the intake manifold.
| *1 | Turn |
Check that the fuel injectors rotate smoothly.
If the fuel injectors do not rotate smoothly, replace the O-ring of any injector that does not rotate smoothly.
Position the fuel injectors with the connectors facing outward.
Tighten the 6 bolts.
Connect the 6 fuel injector connectors.
INSTALL FUEL PIPE SUB-ASSEMBLY
Install the No. 1 fuel pipe and No. 2 fuel pipe with the 2 bolts.
Connect the 2 fuel pipes Click here.
INSTALL REAR CYLINDER HEAD COVER
Temporarily install the cover with the 3 bolts.
Tighten the 3 bolts in the sequence shown in the illustration.
INSTALL IGNITION COIL ASSEMBLY
Install the 6 ignition coils with the 6 bolts.
INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
Install the No. 2 emission control valve set with the 3 nuts.
INSTALL EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
Install the emission control valve set with the 3 nuts.
INSTALL HEATER WATER HOSE ASSEMBLY
w/o Warmer:
Install the heater water hose assembly and connect the 2 hoses.
w/ Warmer:
Install the heater water hose assembly and connect the 3 hoses.
INSTALL ENGINE WIRE