PCV VALVE REMOVAL

  1. REMOVE V-BANK COVER SUB-ASSEMBLY

    1. Hold the front of the V-bank cover sub-assembly and raise it to disengage the 2 retainers on the front of the V-bank cover sub-assembly. Continue to raise the V-bank cover sub-assembly to disengage the retainer on the rear of the V-bank cover sub-assembly and remove the V-bank cover sub-assembly.

      A011RX1

      Note

      Attempting to disengage both front and rear retainers at the same time may cause the V-bank cover sub-assembly to break.

  2. REMOVE VENTILATION VALVE SUB-ASSEMBLY

    1. Disconnect the ventilation hose from the ventilation valve sub-assembly.

      A011TMO
    2. Using a 19 mm deep socket wrench, remove the ventilation valve sub-assembly.

      A011U9J