PURGE VALVE INSTALLATION

  1. INSTALL PURGE VSV

    1. Install the purge VSV with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Connect the 2 fuel vapor feed hoses.

    3. Connect the wire harness clamp and connector.

  2. INSTALL V-BANK COVER SUB-ASSEMBLY

    1. Fit the 3 retainers and install the V-bank cover sub-assembly.