KNOCK SENSOR INSTALLATION

  1. INSTALL KNOCK CONTROL SENSOR

    1. Install the 2 knock control sensors with the 2 bolts as shown in the illustration.

      A011SHGE04
      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
      Text in Illustration
      *a for Bank 1
      *b for Bank 2
      *c Front of Vehicle

      Note

      Make sure that each knock control sensor is in the correct position.

    2. Connect the 2 knock control sensor connectors.

  2. INSTALL INTAKE MANIFOLD

    Click here.