DESCRIPTION
While the engine is being cranked, current flows from terminal STAR of the certification ECU (smart key ECU assembly) to the park/neutral position switch assembly and to terminal STA of the ECM (STA signal).
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
CHECK WHETHER ENGINE CAN BE CRANKED
Check if the engine can be cranked.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| B |
|
READ VALUE USING TECHSTREAM (STARTER SIGNAL) Click here |
| A |
|
READ VALUE USING TECHSTREAM (STARTER SIGNAL)
Connect the Techstream to DLC3.
Turn the engine switch on (IG).
Turn the Techstream on.
Enter the following menus: Powertrain / Engine / Data List / Primary / Starter Signal.
Check the value displayed on the Techstream when the engine switch is turned to the on (IG) and the engine is started.
| Switch Condition | Tester Display (Starter Signal) |
|---|---|
| Engine switch on (IG) | OFF |
| Engine started | ON |
| NG |
|
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY Click here |
| OK |
|
INSPECT RELAY (ST RELAY)
Inspect the ST relay Click here.
| NG |
|
REPLACE RELAY (ST RELAY) |
| OK |
|
INSPECT STARTER ASSEMBLY
Inspect the starter assembly Click here.
| NG |
|
REPLACE STARTER ASSEMBLY Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (ST RELAY - STARTER ASSEMBLY)
Remove the ST relay from the engine room relay block and junction block assembly.
Disconnect the starter assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (BATTERY - STARTER ASSEMBLY)
Disconnect the starter assembly connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (ST RELAY - BODY GROUND)
Remove the ST relay from the engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - ST RELAY)
Remove the ST relay from the engine room relay block and junction block assembly.
Disconnect the park/neutral position switch assembly connector.
Disconnect the certification ECU (smart key ECU assembly) connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (BATTERY - ST RELAY)
Remove the ST relay from the engine room relay block and junction block assembly.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
GO TO SMART KEY SYSTEM Click here
READ VALUE USING TECHSTREAM (STARTER SIGNAL)
Connect the Techstream to DLC3.
Turn the engine switch on (IG).
Turn the Techstream on.
Enter the following menus: Powertrain / Engine / Data List / Primary / Starter Signal.
Check the value displayed on the Techstream when the engine switch is turned to the on (IG) and the engine is started.
| Switch Condition | Tester Display (Starter Signal) |
|---|---|
| Engine switch on (IG) | OFF |
| Engine started | ON |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - ECM) |
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
Inspect the park/neutral position switch assembly Click here.
| NG |
|
REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM)
Disconnect the park/neutral position switch assembly connector.
Disconnect the certification ECU (smart key ECU assembly) connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM - ST RELAY - CERTIFICATION ECU)
Disconnect the park/neutral position switch assembly connector.
Disconnect the ECM connector.
Remove the ST relay from the engine room relay block and junction block assembly.
Disconnect the certification ECU (smart key ECU assembly) connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
GO TO SMART KEY SYSTEM Click here