RELAY INSPECTION


  1. INSPECT WINCH MAIN RELAY

    A015BM1

    1. Push in the plunger and release it. Check that it returns quickly to its original position.

    2. A015DQKE01

      Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      A - B Battery voltage is not applied to terminals 1 and 2 10 MΩ or higher
      Battery voltage is applied to terminals 1 and 2 Below 1 Ω

      If the result is not as specified, replace the winch main relay.