HIGH PITCHED HORN INSTALLATION


  1. INSTALL HIGH PITCHED HORN ASSEMBLY


    1. Connect the horn connector.

    2. A0155HM

      Install the horn with the bolt.

      Torque:
      19 N*m  { 194 kgf*cm, 14 ft.*lbf }
  2. INSTALL UPPER RADIATOR SUPPORT SEAL


    1. Install the radiator support seal with the 7 clips.

      A015BVKE02