LIGHT CONTROL RHEOSTAT INSTALLATION


  1. INSTALL LIGHT CONTROL RHEOSTAT


    1. A015DGQ

      Attach the 2 claws to install the rheostat.

  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY

    A015DOK

    1. Connect the connector.

    2. Attach the 9 claws to install the instrument cluster finish panel.

  3. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH


    1. Attach the 2 claws to install the No. 2 instrument cluster finish panel garnish.

      A0156L8E01
      Text in Illustration
      *A w/ Entry and Start System *B w/o Entry and Start System
  4. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH


    1. A015D40

      Connect the connectors and 2 clamps.

    2. Attach the 8 claws to install the panel pad.

    3. Install the screw.

    4. Install the clip.

  5. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION


    1. A015DQB

      Attach the 7 claws to install the panel cushion.

  6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH

    A01555F

    1. Attach the 3 claws to install the No. 1 instrument cluster finish panel garnish.