INSTALL LIGHT CONTROL RHEOSTAT
Attach the 2 claws to install the rheostat.
INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Connect the connector.
Attach the 9 claws to install the instrument cluster finish panel.
INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
Attach the 2 claws to install the No. 2 instrument cluster finish panel garnish.
| *A | w/ Entry and Start System | *B | w/o Entry and Start System |
INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH
Connect the connectors and 2 clamps.
Attach the 8 claws to install the panel pad.
Install the screw.
Install the clip.
INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION
Attach the 7 claws to install the panel cushion.
INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH
Attach the 3 claws to install the No. 1 instrument cluster finish panel garnish.